SHENZHEN URILIC ENERGY TECHNOLOGY CO.,LTD
10 YEARS OF INDUSTRY EXPERIENCE ! URILIC ENERGY, CREATE NEW NATURE
SHENZHEN URILIC ENERGY TECHNOLOGY CO.,LTD
10 YEARS OF INDUSTRY EXPERIENCE ! URILIC ENERGY, CREATE NEW NATURE
Place of Origin: | China |
Brand Name: | URILIC |
Certification: | ISO9001,CE,UL |
Model Number: | 100W Solar Panel Complete Off grid Solar System |
Minimum Order Quantity: | 1pcs |
---|---|
Price: | Negotiable |
Packaging Details: | Multiple packaging |
Delivery Time: | 5-30 work days |
Payment Terms: | T/T |
Supply Ability: | 1000 sets/ month |
Product Name: | Off Grid Solar Power Systems | Systems: | Solar Street Light System |
---|---|---|---|
Solar Panel: | 100W (2pcs) | Working Voltage: | 12V, 24V |
LED Light: | 20W, 30W, 50W, 60W, 80W | Battery: | 100Ah, 120Ah, 200Ah |
Pole Height: | 5M~12M | Application: | Street Lighting, Outdoor Lighting |
Highlight: | off grid solar panel system,luminous off grid solar system |
Causes of Premature Failure of Solar Street Lights Off Grid Solar Power Systems
Description:
After the solar street light is generally installed, the time for replacing the battery for the first time is 5 to 7 years after installation. Before this, the solar street light can be used and operated normally, because other components except the battery have a service life. They are very long, the life of solar panels is generally 20 to 25 years, the LED usage time is 15-20 years, and the controller life is 8-10 years.
If the solar street light is damaged before the initial replacement of the battery, it is caused by the following reasons:
1. The configuration is not reasonable
Unreasonable configuration will cause the solar street light to be charged normally every day. The battery will be overloaded for a long time, which will shorten the service life of the battery. We suggest that when configuring the battery capacity, there should be more than 20% of the balance. The battery plays a very good role in protection.
2. The installation method is wrong
Some solar street lights are very reasonable in configuration, and the quality of each component of the product is also very good. However, because the installation method is not correct, the battery can not be charged properly. Common installation errors are:
(1). The installation angle of the solar panel is wrong.
For China, the installation direction of solar panels is generally about 15 degrees west of the south, and different areas need to be adjusted accordingly.
(2). Blocking of buildings and trees
Solar street lights are installed in buildings and trees that block sunlight, causing solar street lights to fail to charge properly.
(3). The solar panel is covered
Some construction sites and contaminated areas are dusty, or have many leaves, or heavy snow. After the solar panels are covered, it is difficult to recharge, causing long-term loss of electricity, thus reducing the life of solar street lamps.
Solar street lamps are expensive. When installing solar street lamps, we should install them according to requirements. We should also maintain them regularly in order to ensure that solar street lamps can work normally.
LED Solar Street Light Typical Configuration:
No. | Equipment Name | Model No. / Specification | Unit | Qty. |
1 | Solar Intelligent Controller | 300W24V (Max 540W solar) | set | 1 |
2 | LED Street Lamp | 30W | pcs | 1 |
3 | Solar Panel | 200W MONO Silicon | pcs | 2 |
4 | Battery | 12V 120AH Gel Battery | pcs | 2 |
5 | Pole | 7.2M | pcs | 1 |
Solar Street Light Application:
Contact Person: Mr. Fred Cheng
Tel: 86-13928496081
Fax: 86-755-23061851